1. What weight loading is a mezzanine floor limited to?
|
Most weight loading can be accommodated, from light office occupation to the heaviest of industrial applications. All our floors are custom designed to ensure suitability to your requirements.
|
2. What is the standard height of a mezzanine floor?
|
We usually design the decking height of 2440mm/2740mm/3040mm, and the mezzanine floor will be disguised to suit your requirements and to suit the use of application.
|
3. How quickly can a mezzanine floor be installed?
|
The installation of a mezzanine floor is quick. It usually takes around 1 week or less as all the major fabrication work is carried out away from your premises and the mezzanine floor is delivered as a complete kit that is then assembled at your premises.
|
4. What disruption will there be when installing a mezzanine floor?
|
Our installation team will minimize disruption to you and your company by planning the best logistics of installation and timing.
|
5. Do I need to inform the landlord if I want to install a mezzanine floor?
|
Most landlords will require you to inform them of any proposed works and you will normally require confirmation or approval from building management. Gold Wind Engineering can provide specification design layouts plans for you if required.
|
6. Are your installers experienced in building Mezzanine floors?
|
We have been installing the mezzanine floor platform in Singapore nationally for over 21 years and have considerable project experience.
|